You have a shell unit. Four walls, a concrete slab, and an empty distribution board. Somewhere between that empty space and your opening day, someone needs to design the layout, get three or four separate government approvals, coordinate the MEP works, manage the joinery fabrication, lay the flooring, paint every surface, and hand it back to you ready to trade.
The version of this process where you manage each part separately through different contractors and approval consultants is expensive, slow, and absorbs time you should be spending on your actual business.
The version where one interior fit out company in Dubai handles all of it from the first drawing to the day you walk in and turn the lights on is what Favoritehome delivers.
Tell us your space size, location, and business type. We will get back to you with an honest scope and a clear plan.
Interior fit out is not painting and buying furniture. It is the full transformation of a raw or semi-finished commercial space into a working, compliant, branded business environment. Understanding the full scope is what separates clients who budget accurately from those who get surprised mid-project.
Establish the physical layout of the space. Internal walls, partitions, doorways, new room divisions, ceiling structures including gypsum, feature ceilings, suspended grid systems, and bulkheads. Where the unit has a mezzanine level or requires raised flooring for office cabling infrastructure, that structural work is part of this scope.
Covers everything that runs through the building unseen. Electrical distribution from the distribution board throughout the space, lighting circuit installation as a separate trade from the fixture selection, data and communication cabling, AC ducting and fan coil unit installation, plumbing for every wet area including bathrooms, kitchens, wash stations, and wet rooms, and fire alarm and suppression system installation, mandatory under Dubai Civil Defence requirements for all commercial premises.
Across the full unit uses whichever material the brief requires: large format porcelain, vinyl, carpet tile, epoxy resin, engineered timber, rubber flooring for gym environments. Every floor installation begins with substrate preparation and leveling, and wet area floors receive waterproofing before any surface material is applied.
The element most clients underestimate and the one that defines the finished quality of any commercial fit out. A reception desk designed and built for the specific space, for the brand, and for the dimensions of that unit looks entirely different from a generic unit ordered from a supplier catalogue. The same principle applies to bar counters, shelving systems, display units, workstation structures, storage cabinetry, feature walls, and wayfinding elements. Joinery is where the design becomes visible, and it is the single largest cost variable in any fit out budget.
Fixture specification, installation of all lighting types including ambient, accent, task, and feature lighting, and where the brief requires it, dimmer and smart lighting control systems. Painting and all finishing works complete the space. Signage areas are coordinated into the fit out design from the start rather than treated as a separate installation after handover.
Favoritehome operates as a turnkey interior fit out contractor. Design, approvals, construction, and handover under one contract. One project manager throughout. One fixed price agreed before anything begins.
Spans everything from compact professional offices in JLT or Business Bay through to full floor corporate environments in DIFC and Downtown. The brief typically covers open plan or cellular workstation layouts, a reception area that reflects the company's first impression to visitors, a boardroom, breakout and collaboration zones, a server room with appropriate cooling and access control, and staff amenity areas. Smart lighting integration, branded graphic walls, and hybrid-ready furniture structures are now standard elements of a quality office fit out. DM fit out permit and DCD NOC are mandatory for all commercial office environments regardless of size.
One of the most technically complex commercial fit outs because the kitchen and front of house have fundamentally different requirements that must be coordinated into a single programme. Front of house covers the dining layout, bar counter, booth and banquette seating, host station, and a lighting scheme that creates atmosphere for both daytime and evening service. Kitchen MEP tie-in connects the commercial kitchen to the building's gas, electrical, and drainage infrastructure. DCD fire safety requirements for commercial kitchens are specific: fire suppression hoods are mandatory, and where LPG is used the gas authority approval runs as a separate track alongside DM and DCD.
Requires specific attention to plumbing across multiple wet points, custom joinery for styling stations, and a layout that manages client flow efficiently from reception through to treatment or styling areas. Wash basin plumbing, manicure and pedicure station supply and drainage, reception desk design, product display and retail shelving, and where the brief includes them, private treatment rooms with their own partitioning and lighting. Favoritehome has delivered Lady Salon at Azizi Riviera 35 and Joz Salon, both requiring this full scope of custom joinery and wet area coordination to a premium standard.
Centres on creating a display environment where the product is the hero and the customer journey through the space is deliberate. Display fixtures, product shelving designed for the specific product category, a POS counter, storage areas, and changing rooms where required all form the core scope. Lighting in retail is a revenue driver, not just a practical element. For units inside malls, Favoritehome manages the additional mall management approval and tenant fit out guide compliance that sits on top of DM and DCD requirements.
Has requirements that general commercial fit out contractors regularly get wrong. Flooring specification matters enormously: rubber and shock-absorbing surfaces in the main training area, different surface treatments in the stretching and yoga zones, and fully waterproofed surfaces in changing rooms and showers. Zone partitioning, mirrored wall installation, electrical capacity for equipment loads, and a reception and check-in area that manages member flow are all part of the scope. Favoritehome has completed WOC Gym Dubai and Fitness 360 Gym Dubai as delivered projects.
Operates under a completely different constraint from all other commercial categories: the property must remain operational during the works. Guest rooms, lobby areas, F&B outlets, spa and wellness spaces, and corridors must be phased so that the hotel continues selling rooms and serving guests throughout.
A cafe lives and dies by its atmosphere, and atmosphere in a small space comes almost entirely from joinery and lighting. The counter and brewing area needs to be designed around the specific workflow of the coffee programme, with custom bar joinery that integrates the equipment seamlessly into the visual brand. Seating and table arrangements, display case positioning, and the ordering flow all affect how many covers the space can turn in a day. Kitchen MEP tie-in for the prep area, warm layered lighting design, and DM and DCD approvals complete the scope.
The approval process is where most fit out projects in Dubai lose time, and where most fit out contractors quietly hand the problem back to the client. Favoritehome does not. Every approval required for every fit out project is managed inside the contract scope from the first submission to the final certificate.
Always the first step. Before any contractor enters a commercial unit in Dubai, the building owner or management company must issue a No Objection Certificate approving the proposed works. Favoritehome prepares the technical submission that building management reviews.
Covers the architectural layout, MEP plans, and compliance with the Dubai Building Code.
Covers fire safety across the entire fitted-out space. Fire alarm systems, suppression systems where required, emergency lighting, exit signage, and from 2026 the mandatory Hassantuk smart fire monitoring connection must all be specified in the DCD submission drawings. DCD operates independently across every Dubai zone and is always required in addition to whatever zone authority governs the location.
Required for electrical load changes and significant plumbing works.
For units in free zone areas such as Dubai Design District, JBR, JLT, or DMCC-registered premises, the relevant zone authority approval replaces or supplements DM, and Favoritehome manages whichever authority applies.
A space fitted out without a DM permit cannot receive its completion certificate. A business that opens without DCD approval is operating outside the law and will be blocked from renewing its trade license. These are not procedural details. They are the difference between a business that opens on its planned date and one that does not.
Favoritehome submits all applicable authorities in parallel rather than in sequence. This alone saves two to three weeks on the total approval period compared to clients or contractors who handle each submission after the previous one is closed.
WhatsApp Favoritehome with your space size, location, and type of business. We will confirm what approvals your project needs and give you a realistic cost and timeline estimate within 24 hours.
Four factors move the cost within any tier. Joinery volume and complexity is the single biggest variable. A space with a simple reception desk and standard shelving costs considerably less than a space where every surface is a bespoke fabricated element. Wet area count is the second driver, because every wash basin, sink, pedicure station, or bathroom adds plumbing, drainage, waterproofing, and tiling cost that a dry-area-only space does not carry. MEP scope relative to the existing building services is the third, and ceiling height and treatment type is the fourth.
Small salon or retail unit, 300–500 sq ft
Mid-size office or restaurant, 500–1,500 sq ft
Large commercial space, 1,500 sq ft and above
All these timelines assume approvals are running in parallel with design preparation from the first day of the project, not starting after the design is finalised.
Every Favoritehome project is quoted with a fixed scope and a fixed price after the site survey. The number agreed at contract stage is the number paid at handover.
The trades that complete your fit out are Favoritehome's own in-house team. Civil works, MEP, joinery fabrication, flooring, painting, and finishing are all executed by the same people who quoted the project. There is no layer of subcontractors doing the work on behalf of a company who sold you something they then outsourced.
Full approval management is included in every project contract. DM, DCD, DEWA, building management, and free zone authorities where applicable are all submitted and tracked by Favoritehome. The client does not need to interact with any government authority.
As a professional fit out contractor in Dubai, Favoritehome assigns one project manager to every project for the full duration. One number to call. One fixed price agreed before work begins.
The office is in Deira, Dubai. Site visits are available across Dubai and the UAE, typically within 48 hours of first contact.
Interior fit out is the full transformation of an empty or semi-finished shell space into a fully operational business environment. It starts from a raw unit and ends with a compliant, branded, trade-ready space. Renovation is the upgrade of a space that has already been fitted out previously, updating or improving what is already there rather than building from scratch. Favoritehome does both. If you have signed a lease on a new shell unit, that is a fit out. If you are upgrading an existing salon, office, or restaurant, that is a renovation. The technical approach differs but the single-contract, fixed-price model applies equally to both.
Most commercial fit out projects in Dubai require five approval stages. The building management NOC must be obtained first, before any contractor enters the unit. The Dubai Municipality fit out permit covers your layout, MEP plans, and building code compliance. The DCD fire safety NOC covers fire alarm, suppression systems, emergency lighting, and from 2026 the mandatory Hassantuk smart monitoring connection that must be shown on all DCD submission drawings. The DEWA NOC covers electrical load changes and plumbing modifications. If your unit is in a free zone such as JBR, JLT, Dubai Design District, or a DMCC-registered premises, the relevant zone authority approval applies alongside or in place of DM. Favoritehome manages all of these as part of the contract. Missing any single approval means the space cannot legally open or trade.
Fit out cost in Dubai is quoted in AED per square foot and varies by sector and finish level. Standard office fit out runs AED 150 to 250 per square foot. Mid-range commercial fit out runs AED 250 to 400 per square foot. Premium restaurant or salon fit out runs AED 400 to 600 per square foot. Luxury retail or hospitality fit out runs AED 600 to 800 per square foot and above. The main drivers that move your cost within any range are joinery volume and complexity, the number of wet areas, the MEP scope relative to existing building services, ceiling height and treatment type, and overall material grade. All costs are confirmed in a fixed-price quote produced after the site survey, so both sides know the number before any commitment is made.
Timeline depends on project size and complexity. A small salon, barber shop, or retail unit of 300 to 500 square feet typically takes 4 to 6 weeks from approvals received to handover. A mid-size office or restaurant of 500 to 1,500 square feet takes 6 to 10 weeks. A large commercial space of 1,500 square feet and above takes 10 to 16 weeks. The two variables that affect every timeline most are approval lead time and custom joinery fabrication lead time. Both can be compressed significantly when approvals are submitted in parallel with design from the first week of the project. Favoritehome runs approvals and design preparation simultaneously from day one.
Yes. Favoritehome operates as a turnkey interior fit out company, which means design and construction are delivered under one contract. The design stage produces a full space plan showing the layout, room by room, at the agreed dimensions. 3D visualisations show the finished result with materials, lighting, and joinery in context, so the client can see exactly what they are approving before construction begins. Material selections are presented alongside the visuals. Joinery drawings show each bespoke element in detail before fabrication starts. The client approves each stage before the next begins. What appears in the visuals at design sign-off is what appears at handover.
Yes. Favoritehome operates across Dubai and the UAE including free zone areas. Free zones have different governing authorities. Projects in JBR and other PCFC-managed areas require Trakhees approval. Projects in Dubai Design District require DDA approval. Projects in JLT or involving DMCC-registered companies require DMCC compliance. In every case, DCD fire safety approval is a separate parallel requirement that applies across all zones independently. Favoritehome identifies the applicable authorities for the specific location and manages all submissions simultaneously rather than sequentially, saving the total approval period meaningfully.
Yes. Restaurant and F&B fit out is one of Favoritehome's primary sectors. The kitchen scope covers MEP tie-in to the building's gas, electrical, and drainage infrastructure, fire suppression hood installation above all commercial cooking equipment, specification of the suppression agent matched to the cooking equipment type, and LPG authority approval where gas is the fuel source. These elements form the DCD submission for the kitchen specifically and are reviewed separately from the front-of-house DCD drawings. The Food Safety Department approval may also be required depending on the business classification. All of these are managed by Favoritehome inside the restaurant fit out contract alongside the full front-of-house delivery.
WhatsApp Favoritehome with the size of your space in square feet or metres, the location or address, and the type of business you are opening. That is all we need to arrange a site visit. The site visit is typically within 48 hours of first contact. After the visit, we produce a fixed-price quote covering the full scope of works, all approvals, and the project timeline. The quote costs nothing and requires no commitment. If you would rather call directly, the number is +971 55 5339596.
You have a space. You have a vision for what your business will be. The fit out is the step between the empty unit and the day you open. Favoritehome makes that step one conversation, one contract, and one fixed price. As a full-service interior fit out company in Dubai, we handle the design, the approvals, and the build entirely. You focus on your business. Everything else is handled.