Golden Tulip Hotel Dubai (glass and ACP sheets)

Golden Tulip Hotel Dubai (glass and ACP sheets)

  • Golden Tulip Hotel Dubai Dispose and curt away the existing silicon joints for all glass and ACP sheets
  • Dispose and curt away the existing silicon joints for all glass and ACP sheets
  • Supply and installation of stainless steel pressure U channel for the missed or damaged sections (30% of whole building based on calculated)
  • Windows and balcony waterproofing and joint repair
  • Interior wall finsihes and cladding
ClientGolden Tulip Hotel
Project yearOctober 25,2021
LocationDubai
DesignerISABEL